100% of the Eva copper project, an iron oxide-copper gold resource, together with 16 exploration tenements, was acquired in December 2022. Following the completion of the feasibility study, a board decision was made in November 2025 to proceed with construction.
The project is poised to become the largest copper mine in northwest Queensland, Australia, and extends Harmony’s diversification into copper, a future-facing metal critical to the energy transition. First production is expected in the second half of 2028.
Key facts
Location:
Australia
on the traditional lands of the Kalkadoon People, in Cloncurry, 75km north from the town centre and 95km northeast of Mount Isa in northwest Queensland
Current status
Construction
Fully permitted
Planned mining method
Multiple open-pit
six pits and a conventional copper concentrator, comprising crushing, grinding and flotation
Planned Life-of-mine
+15 years
Since acquiring the project, Harmony has identified opportunities to enhance the asset and its contribution to stakeholders. These opportunities include the use of renewable power and implementation of an optimised design to potentially deliver greater production volumes. We are prioritising local employment and supplier opportunities in Cloncurry and Mount Isa, where possible.
Contact
Supply our project
Join our supplier portal to explore opportunities to supply goods and services to the project.
Work at Eva copper
Register your interest to work on this once-in-a-generation greenfield project.
Contact us
General enquiries
Supplier enquiries
Employment enquiries
Tel: +61 7 4442 2211
47 Ramsay Street, Cloncurry QLD 4824
Public notice
Harmony is seeking approval under the EPBC Act for the Stage 1 Referral Action (EPBC 2026/10587). The Stage 1 Referral Action is designed to support development of Critical Path Activities necessary to achieve first production of copper concentrate from the Project. The Stage 1 Referral Action has been identified as a standalone component of the broader Project, and has been determined to be a controlled action requiring assessment by Preliminary Documentation. The controlling provisions under the EPBC Act are listed threatened species and communities (section 18 and section 18A).

Current focus
- Front-end engineering design is complete, and preliminary site works are well advanced with construction expected to take 24 to 30 months.
- Ongoing community consultation to shape the Eva Copper Community Investment Framework for a structured, transparent and consistent approach to creating shared social value.
Performance forecast
Annual Gold Production
~19 000oz
Annual Copper Production
~60 000 tonnes
Tailings storage capacity
300Mt
Strip Ratio
1.6:1
Mineral resources at November 2025
Gold and gold equivalent Resources (inclusive)
8.6Moz
Copper Mineral Resources (inclusive)
4.3Mlb
Gold Grade
0.86g/t
Copper grade
1.2%

Introducing our Eva Copper Project
Eva Copper is another exciting venture into copper mining and we are committed to doing it the right way!